Dachen Class
Dachen Class

Dachen pipe well system

作者:张雄 日期:2021-04-28 人气:1570

There are many elevator wells and hydropower pipeline wells in high-rise and super-high-rise public buildings .The traditional practice is to use blocks to bulid well lanes.However,the block wall is white and needs to be set up scaffolding and maintenance time,which will lead to long construction period,great hidden danger of safety risk,large workload of vertical transportation of materials and so on,In Europe and the United States and other developed countries,more and more super high-rise buildings have adopted light weight, fast construction,no scaffolding and mainrenance of light steel keel gypsum board pipeline well systems.China's first tallest building,Shenzhen PING AN building,and the second tallest building,Shanghai Center building,have adopted a pipeline well system.

    

    

 Dachen pipeline well system is made of 25mm thick gypsum board and CH,E,J keel.It is simple in construcion,dry operation,no mainence,and can be installed on one side of the well without scaffolding.It effectively solves many safety,technical and work effciency problems of super high-rise pipe wells,and is widely praised by owers,design,general package and construction experts.


629
5